Union Construction Update
Video update chronicling construction of Lincoln Property Company’s new Class A Union office building in Mesa, AZ.
Process
- Coordinate with construction supervisor for on-site drone footage.
- Review previous construction update videos from client to identify shot style, music preference, and flow.
- Film all on-site shots based on shot list.
- Consult with client to select background song and composite shots into a project that flows with the song choice.
- Incorporate provided graphics into animated intro and outro.
- Animate and utilize infographics as pop ups throughout video.
- Film additional/updated construction shots and splice them into existing composition.
- Render at highest possible quality, compress for web use, and provide to client.
SKILLS USED
Drone Filming
Video Composition
Sound Design
Motion Graphics
PROGRAM USED
Adobe Premiere Pro
EQUIPMENT USED
DJI Mavic Air 2
DJI Mavic Mini